Institutional and Social Innovations in Irrigation Mediterranean Management
Home
Presentation
Partners
Worksites 
Organisation
Links
Events
Documents
Index keyword
To read
Newsletter/Poster
Contacts

DOC

Intranet

photos

  
 title/abstract   author/editor   author/title   author/abstract   keyword 
Français

WORKSITES MAP Egypt France Italy Lebanon Morocco Spain

Italy  Italy

General View:

Water is relatively abundant in Italy but despite high rainfall, seasonal and regional variability is extremely high, as in all Mediterranean countries, being influenced by natural and technical factors. The quantity of water which is available for use depends on infrastructure and storage capacity, which vary according to the nature of the landscape. The mountainous nature of a large part of the Italian territory reduces the scope for internal water transfers, forcing many regions to rely on their own water resources.

Recently, the higher frequency of extreme climate events has affected the hydrological system through flooding in the northern regions and the far south. Evidence shows that between 1946 and 1990 more than half of Italian municipalities were damaged by hydrological phenomena. The national hydrological service is inadequate for flood prediction, with only a few centres being able to make weather forecasts based on mainframe modelling systems. This enhances the vulnerability of the whole hydrological system.

High population density, the agricultural tradition in the Italian economy and Italy's rapid development are all elements that put pressure on water resources and affect both water availability and water quality. In some ways all these problems have been exacerbated by cultural conditions including a lack of care and of awareness. Water has been perceived as an infinite resource, to be made available at a very low price. Wasteful behaviour has not only been common, but also accepted. Italy is going through a gradual process of institutional decentralisation, evolving towards the progressive empowerment of Regions and Local Authorities. This slow and difficult process of institutional reform has influenced the evolution of water policies, and is partly responsible for the contradictions that can be observed in the tentative process of integration of water policies. Planning is still done in a piecemeal way, separating issues of water quality and demand management and implementation is slow and often problematic.

The Case studies

Click on image

Case Study: Piave River Basin

The Piave River is the fifth most important river in Italy. The Piave basin is situated in the north-eastern part of the Italian peninsula. The area of the basin is 4,100 sq. km; the main course of the river is 220 km long.

In the basin there are 127 municipalities that include important cities, industrial centres and touristic areas. The basin is populated by 381,000 inhabitants.

The Piave River basin is characterised by an artificial system of water resources built between 1920 and 1960. It is, in fact, an artificial hydrographic network placed over the natural system for the use of hydroelectric power. There are in the Piave basin 22 hydroelectric power plants. There is the natural river which no longer shows signs of life and an artificial river which, on the other hand, is hydraulically very lively, composed of reservoirs, 6 big dams, 17 penstocks, tunnels, sluice gates, line canals, etc. The artificial system has radically changed the hydrologic form of the river, modifying the fluvial dynamic, the transport of solid materials and the landscape of the riverbed. In the artificial system of the Piave, the terrible Vajont catastrophe must be remembered: a 250 million cubic metre mass of rock slid into the lake in October 1963 causing a wave which destroyed the Piave valley, killing more than 2,000 victims and wiping out whole villages. The Vajont disaster also deprived the system of a volume of 150 million cubic metres of water which were needed to complete the artificial system for the exploitation of the water resources of the Piave.

The average annual precipitation in the Piave basin is more than 1,500 mm: higher than the national average of 1,000 mm. It has always offered a wide availability of water resources to satisfy different demands. However, in the last 50 years the increase of water demand has not been able to be balanced by a sufficient offer. It has brought about a conflict between new requirements to give back water to the river, safeguard the natural environment, and the strong hydroelectric power and irrigation system.

In the Piave basin there is a certain tendency towards the increase of phenomena of maximum intensity. Experts on climatic variations usually call this tropicalisation of the climate. Instead of a substantially constant annual rainfall, precipitation is concentrated ever more frequently in short lived events. This emphasises the impetuous nature of the river where the flood discharge during the most significant events reaches maximum values of 3-4,000 cu. m/s. Instead, periods of minimal discharge are concentrated in the winter and summer months and often have the characteristics of a period of drought. As regards the water balance, only a small part effectively reaches the sea. In fact, in the drier periods, the discharge into the sea is only a few cubic metres per second. This is due both to the diversions caused by the large hydroelectric and irrigation plants and to infiltration of the residual flow inside the gravel deposits which characterise the river bed in the higher part of the plain.

The usage system. The Piave River's waters are used for civil and industrial purposes, irrigated agriculture and hydroelectric generation. Along with such uses the water required for landscape-environmental quality and also for tourism on the lakes and the river must be included. The aim is the recovery of a volume of water to maintain or release into the river bed to guarantee the minimum vital flow. That is, the discharge necessary to guarantee the safeguarding of the physical characteristics of the river, the chemical and physical nature of the water, as well as maintaining the biotic community typical of natural local conditions. The current uses along the river can be distinguished in two broad categories in relation to the amount of water derived. The first category (with total consumption of some cubic metres per second) turns out to be civil use, including drinking water and small industry. The second category (with total extractions to the order of ten cubic metres per second) includes hydroelectric generation and the water supplied for irrigated agriculture. The Piave River is significantly altered by the effects of water use, particularly those for hydroelectric generation and irrigation that have progressively increased water extraction and, hence, damage to river flow.

Irrigated agriculture. The use of the Piave water for agriculture and irrigation is fundamental, but at the same time very problematic and unsustainable. 100,000 hectares of agricultural land is irrigated by the Piave water. The irrigated system uses most of the available water resources of the Piave river, 60% during the year up to 70% during the summer months. The flows taken by the river to irrigate the land are given back only minimally through the underground stratum while 50% is lost in the processes of evaporation.

The conflict. The situation in certain summer periods become highly conflictual. The maximum water demand occurs in these months because unless agriculture has water the seasonal production will be lost. There is the maximum influx of tourists in the mountains with the need to have water in the river beds in the mountain fluvial system and to have lakes at the maximum level to use those places touristically. At the same time in August, it is necessary to produce hydroelectric power even if during this month the level is minimal because the factories are closed for summer holidays. In the summer months in the fluvial section of Nervesa della Battaglia at the outlet of the basin, where the river starts to flow into the plain, the natural discharge should be on average around 100 cubic metres a second. However, the irrigation concessions granted account for exactly 98 cubic metres a second. Thus, for that section, for all the tract of plain to the sea, there is no more water in the river bed. All the water produced by the river is withdrawn for agriculture. Besides this, the figure of 100 cubic meters per second is only apparent due to the fact that an average value does not take into account years or months of drought. When these conditions occur the system goes into a crisis, as happened in summer 2003, and the conflict is particularly heated.

Piave presentation in PDF format

 Related ressources


 Agricultural
docMain results of the latest Agriculture Census in Italy (2000). (doc)
docAnalisis report on the irrigation investments in the Central Septentrional Regions of Italy (doc)

 Cartography - GIS - Remote sensing
articleScience summary : Satellite and Airborne Remote Sensing Investigations - Venice, Italy (article)
mapThe Piave River Basin (Italy) (map)
mapStreet map of Treviso province, Veneto region, Italy (map)
mapLand use in Paese and Istrana (2002), west of Destra Piave reclamation district, Veneto, Italy (map)
mapLand reclamation district Treviso, Veneto, Italy (map)
mapIrrigation Destra Piave Land reclamation district and rates of infiltration, Treviso province, Veneto, Italy (map)
mapConsorzio Destra Piave Area, Veneto, Italy (map)
mapMap of Veneto region, Italy (map)
mapCorineLandcover - Soil use map in the study zone of Piave - Italy (map)
mapIrrigation perimeters map of the Piave study zone (map)
mapHidrografic map of Piave basin (map)
mapBiogeographiques areas of Piave basin - Italy (map)
mapConsortium Destra Piave map (map)
mapPiave hydrographic network map (map)
mapIrrigation map of Italy (Gulhati 1955, ICID) (map)

 Case studies
reportISIIMM project: Case studies synthesis - Italy (english) (report)
reportProgetto ISIIMM: Sintesi dei casi di studio - Italia (report)
reportISIIMM project: Case studies synthesis - Lebanon (english) (report)

 Environment
linkGruppo 183 - association for the protection of soil and water resources (link)

 Environment development
docAGRI-ENVIRONMENTAL MEASURES IN ITALY State of application of reg. (EEC) 2078/92 (doc)

 Hydrological - Hydraulic
articleManagement of the water ressources of the Piave River amid Conflict and Planning (article)

 Hydropolitics
reportThe Evolution of the National Water Regime in Italy (report)

 Images / Photos
photoPhotos Destra Piave, province of Treviso in the Veneto region, Italy, April 2004 (photo)
photoPhotos Seminar Treviso, Veneto region, Italy, April 2004 (photo)

 Institutional
bulletinFirst number of Cinquefiumi (five rivers)- november 2002 (bulletin)
linkDestra Piave consortium website - Italy (link)
figureItaly Institutional Organisation (figure)

 ISIIMM Posters
posterSeminar poster - Scientific committee Treviso, Italy, Oct. 2004 (poster)
posterPoster : Stakeholder's Involvement in Water Resources Management for Irrigation, exchange seminar Lebanon-Italy, Treviso (Italy) 12-15 December 2005 (poster)
posterPoster : ISIIMM project - the italien case (poster)

 ISIIMM project
resourceISIIMM flyer (italien version 1Mo) (resource)

 Legislation
reportNorm framework of water use in agriculture. Communal, regional and national norms - Italy (report)
reportAnnual report to the Parliament on the state of the water services Year 2003 (report)
docDELIBERATIONS OF THE INSTITUTIONAL COMMITTEE ALTO ADRIATICO BASIN AUTHORITIES, Italy water legislation - (doc)

 National water legislation
docWUA Legislation Country Profiles: ITALY (doc)

 Seminars
flyerKnowledge on water - Interdisciplinary research seminar - Hydraulic archaeology (seminar program). (flyer)

 Territorial
docPopulation and habitat dynamic in the province of Treviso 1981-2001 (doc)
docVeneto region facing the new millenium: structure and dynamic (doc)

 Transversal
articleCharter of the Piave (article)

 Water management
articleAgriculture, Water Resources and Water Policies in Italy (article)


EURO-MEDITERRANEAN Regional Programme for Local Water Management
ME8/AIDCO/2001/0515/59763-P 016
Agropolis, France